Basic and detail engineering of the 20 KV double circuit transmission line & substation for leaching project – Sarcheshmeh Copper Complex.
Feasibility study , technical documentation and EPC contract engineering services for 132 KV, double circuit transmission line and 132/20 KV substation with 60 MVA installed power for Sangan Iron Mines project.
Project management services and supervision for 132 KV power transmission and substation construction.
Basic and detail engineering of the 20 KV electrical power transmission and distribution system for the Ghasr-e-Shirin fish farm. This project includes a 70 km, 20 KV double circuit transmission line.
Feasibility study for The Electrical power supply (100 MVA) for The Mehdi abad zinc production project.